Search
Find a document, activity or package
Practical queries work: floor tile WIR, material inspection, ACT-130, TAB, O&M.
461 results for “MIR”
Documents 306
Open in the document registerMaterial Inspection RequestACT-062
Tile Material Receiving Checklist
Floor Tiling (Ceramic / Porcelain) · Architectural
Material Inspection RequestACT-100
AHU and FAHU Material Receiving Checklist
AHU / FAHU Installation · HVAC
ChecklistACT-013
Site Clearance and Grubbing — Inspection Checklist
Site Clearance and Grubbing · Civil
Inspection and Test PlanACT-013
Site Clearance and Grubbing — Inspection and Test Plan
Site Clearance and Grubbing · Civil
ChecklistACT-014
Excavation Works — Inspection Checklist
Excavation Works · Civil
Inspection and Test PlanACT-014
Excavation Works — Inspection and Test Plan
Excavation Works · Civil
ChecklistACT-015
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Inspection Checklist
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) · Civil
Inspection and Test PlanACT-015
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Inspection and Test Plan
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) · Civil
ChecklistACT-016
Diaphragm Wall Construction — Inspection Checklist
Diaphragm Wall Construction · Civil
Inspection and Test PlanACT-016
Diaphragm Wall Construction — Inspection and Test Plan
Diaphragm Wall Construction · Civil
ChecklistACT-017
Dewatering Works — Inspection Checklist
Dewatering Works · Civil
Inspection and Test PlanACT-017
Dewatering Works — Inspection and Test Plan
Dewatering Works · Civil
ChecklistACT-018
Bored Piling Works — Inspection Checklist
Bored Piling Works · Civil
Inspection and Test PlanACT-018
Bored Piling Works — Inspection and Test Plan
Bored Piling Works · Civil
ChecklistACT-019
Pile Load Testing (Static / Dynamic) — Inspection Checklist
Pile Load Testing (Static / Dynamic) · Civil
Inspection and Test PlanACT-019
Pile Load Testing (Static / Dynamic) — Inspection and Test Plan
Pile Load Testing (Static / Dynamic) · Civil
ChecklistACT-020
Pile Integrity Testing — Inspection Checklist
Pile Integrity Testing · Civil
Inspection and Test PlanACT-020
Pile Integrity Testing — Inspection and Test Plan
Pile Integrity Testing · Civil
ChecklistACT-021
Pile Head Cutting and Trimming — Inspection Checklist
Pile Head Cutting and Trimming · Civil
Inspection and Test PlanACT-021
Pile Head Cutting and Trimming — Inspection and Test Plan
Pile Head Cutting and Trimming · Civil
ChecklistACT-022
Blinding Concrete — Inspection Checklist
Blinding Concrete · Civil
Inspection and Test PlanACT-022
Blinding Concrete — Inspection and Test Plan
Blinding Concrete · Civil
ChecklistACT-023
Below-Grade Waterproofing (Membrane) — Inspection Checklist
Below-Grade Waterproofing (Membrane) · Civil
Inspection and Test PlanACT-023
Below-Grade Waterproofing (Membrane) — Inspection and Test Plan
Below-Grade Waterproofing (Membrane) · Civil
ChecklistACT-024
Anti-Termite Treatment — Inspection Checklist
Anti-Termite Treatment · Civil
Inspection and Test PlanACT-024
Anti-Termite Treatment — Inspection and Test Plan
Anti-Termite Treatment · Civil
ChecklistACT-025
Raft Foundation Construction — Inspection Checklist
Raft Foundation Construction · Civil
Inspection and Test PlanACT-025
Raft Foundation Construction — Inspection and Test Plan
Raft Foundation Construction · Civil
ChecklistACT-026
Pile Caps and Grade Beams — Inspection Checklist
Pile Caps and Grade Beams · Civil
Inspection and Test PlanACT-026
Pile Caps and Grade Beams — Inspection and Test Plan
Pile Caps and Grade Beams · Civil
Activities 152
Site Clearance and Grubbing
Civil · During Construction
Excavation Works
Civil · During Construction
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles)
Civil · During Construction
Diaphragm Wall Construction
Civil · During Construction
Dewatering Works
Civil · During Construction
Bored Piling Works
Civil · During Construction
Pile Load Testing (Static / Dynamic)
Civil · During Construction
Pile Integrity Testing
Civil · During Construction
Pile Head Cutting and Trimming
Civil · During Construction
Packages 3
Floor and wet-area finishes
Screeding, porcelain floor tiling and wet-area waterproofing, from method statement through inspection records.
Foundations and concrete quality
Pile integrity testing, concrete pouring inspection and roof waterproofing records for the structural package.
Services inspections
Material receipt for the air handling units, switchgear inspection and duct leakage testing.