ACT-018 / ITP / R00
Bored Piling Works — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Set out pile | — | — | — | — | — |
| Record bore and base release | — | — | — | — | — |
| Witness cage and concrete placement | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: boring rig, casing, cage and tremie
Inspection sequence
- Set out pile
- Record bore and base release
- Witness cage and concrete placement
Inspection controls
- Strata, depth, volume, pile ID and as-built survey
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________