Phase 02
During Construction
Discipline-specific method statements, WIR and MIR forms, inspection checklists, activity ITPs, testing reports, NCR, SOR and CAR forms, audits, HSE documents, progress reports and document control registers.
152 activities · 618 documents
What this phase covers
Documents
Open in the registerWork Inspection RequestACT-062
Floor Tile Installation Checklist
Floor Tiling (Ceramic / Porcelain) · Architectural
Method StatementACT-062
Floor Tiling Method Statement
Floor Tiling (Ceramic / Porcelain) · Architectural
Method StatementACT-061
Floor Screeding Method Statement
Floor Screeding · Architectural
Work Inspection RequestACT-056
Roof Drain and Membrane Interface Checklist
Roof Waterproofing and Insulation · Structural
Test FormACT-110
Stormwater Outlet Flow Test Record
Storm Water Drainage · Plumbing
Handover / CloseoutACT-067
Ceiling Closure and Coordinated Trade Release
Gypsum Board / Mineral Fibre False Ceiling · Architectural
Risk AssessmentACT-062
Floor Tiling Risk Assessment
Floor Tiling (Ceramic / Porcelain) · Architectural
Inspection and Test PlanACT-062
Floor Tiling Inspection and Test Plan
Floor Tiling (Ceramic / Porcelain) · Architectural
Material RequirementsACT-062
Tile and Adhesive Submittal Checklist
Floor Tiling (Ceramic / Porcelain) · Architectural
Material Inspection RequestACT-062
Tile Material Receiving Checklist
Floor Tiling (Ceramic / Porcelain) · Architectural
Test FormACT-020
Pile Integrity Test Witness Record
Pile Integrity Testing · Civil
Work Inspection RequestACT-035
Concrete Pre-Pour Release Checklist
Concrete Pouring (General) · Structural
Test FormACT-090
Façade Sealant and Water Test Witness Record
Façade Sealants and Water Testing · Architectural
Material Inspection RequestACT-100
AHU and FAHU Material Receiving Checklist
AHU / FAHU Installation · HVAC
Test FormACT-094
Duct Leakage Test Record
Duct Leakage Testing · HVAC
Work Inspection RequestACT-134
Switchgear and Electrical Panel Inspection
MV / LV Switchgear and Panels Installation · Electrical
Test FormACT-156
Lift Commissioning Witness Record
Lift Testing and Commissioning · Specialist Systems
Work Inspection RequestACT-158
Interlock Paving Installation Checklist
Interlock Paving · Infrastructure
Work Inspection RequestACT-065
Washroom Waterproofing Inspection and Release
Wet Area Waterproofing · Architectural
Work Inspection RequestACT-074
Fire-Rated Door Assembly Inspection
Steel / Fire-Rated Doors Installation · Architectural