SQP / QA/QC services
Quality support for the documents your project actually needs.
Beyond the free library, SiteQuality Pro takes on project-specific QA/QC documentation: written to your specification, reviewed with your team and issued through your document control.
Project quality documentation
Project Quality Plan, quality procedures and inspection and test plans written to your contract and specification, not copied from a generic pack.
Method statements and risk assessments
Activity method statements with sequenced steps, hold points, plant and labour requirements, and matching risk assessments.
Inspection and test readiness
Review of ITPs, checklists and inspection records before an audit, client inspection or third-party surveillance visit.
NCR, SOR and CAR management
Structured non-conformance reporting, root cause analysis and corrective action close-out, with a register you can report from.
Commissioning and handover packs
Pre-commissioning and commissioning plans, test records, snag lists, O&M compilation and the final handover dossier index.
Document control and reporting
Transmittal structures, registers, revision control and the weekly or monthly quality reporting your client expects.
[ How a commission runs ]
From brief to issued documents.
- 01
Brief
You send the scope, discipline, specification extracts and deadline.
- 02
Draft
The document set is written against your project, with placeholders clearly marked.
- 03
Review
You review, we revise. Technical criteria stay with your engineering team.
- 04
Issue
Final files are issued in editable and PDF format, ready for your document control.
[ Who this is for ]
Main contractors, subcontractors and consultants.
Most commissions come from teams that need a document set quickly and properly: a subcontractor preparing for a pre-construction meeting, a contractor responding to a client audit, or a consultant who needs consistent inspection records across several packages.
If a document you need already exists in the free library, use it. The service exists for the parts that are specific to your project, your client or your contract.
Request a quote
Send the scope, discipline, specification references and deadline. You will get a written scope and price before any work starts.