Skip to content

SQP / Open licence

Free to use, edit and share, anywhere in the world.

Every template on SiteQuality Pro is published under the Creative Commons Attribution 4.0 International licence (CC BY 4.0). No account, no payment, no permission needed.

[ The licence in one line ]

Use it, change it, sell your work built on it, share it with anyone. Credit SiteQuality Pro and say whether you changed the document.

Read the full licence text

You are free to

  • Use the documents on any project, commercial or private, at no cost.
  • Edit, rebrand and restructure them to suit your contract and client.
  • Include them in tender submissions, quality plans and handover dossiers.
  • Share them with colleagues, subcontractors and clients, in any format.
  • Use them in paid work and training material, without paying a royalty.

Under one condition

You must give appropriate credit, link to the licence, and indicate if changes were made. You may do this in any reasonable manner, but not in a way that suggests SiteQuality Pro endorses you or your use.

Suggested attribution

<a href="https://sitequalitypro.com">SiteQuality Pro</a>
"Method Statement for Concrete Pouring" (SQP-STR-MS-003),
licensed under CC BY 4.0. Changes were made.

In a document footer or an internal register, a single line is enough: “Based on a SiteQuality Pro template (SQP-STR-MS-003), CC BY 4.0. Adapted for this project.”

What the licence does not cover

The licence covers the text, tables and layout created by SiteQuality Pro. It does not cover third-party material such as published standards (BS, EN, ASTM, ISO), client specifications, project drawings, photographs or trademarks referenced inside a document. Those remain subject to their own rights and licences.

It also does not cover the SiteQuality Pro name and logo: you may credit them, but not use them as your own branding.

No warranty

The documents are provided as-is, without warranty of any kind. They are generic starting points, not engineering advice. Always review technical criteria against your contract, project specification and local codes, and have them approved by the responsible engineer before use on site.