Phase 03
After Construction
FAT and SAT, pre-commissioning and commissioning plans, ATP templates, integrated system testing, asset registers, snagging, O&M manuals, warranties, training records, as-built logs and handover dossiers.
6 activities · 28 documents
What this phase covers
Documents
Open in the registerHandover / CloseoutACT-170
Final Handover Dossier Acceptance Index
Project Handover · Commissioning and Handover
Handover / CloseoutACT-166
Snag and De-Snag Register
Snagging and De-snagging · Commissioning and Handover
Handover / CloseoutACT-168
As-Built Drawing Verification Sheet
As-Built Drawings Preparation · Commissioning and Handover
Handover / CloseoutACT-169
O&M Manual and Training Acceptance Checklist
O&M Manuals and Training · Commissioning and Handover
Method StatementACT-165
Integrated Systems Testing (IST) Method Statement
Integrated Systems Testing (IST) · Commissioning and Handover
Method StatementACT-166
Snagging and De-snagging Method Statement
Snagging and De-snagging · Commissioning and Handover
Method StatementACT-167
Final Cleaning Method Statement
Final Cleaning · Commissioning and Handover
Method StatementACT-168
As-Built Drawings Preparation Method Statement
As-Built Drawings Preparation · Commissioning and Handover
Method StatementACT-169
O&M Manuals and Training Method Statement
O&M Manuals and Training · Commissioning and Handover
Method StatementACT-170
Project Handover Method Statement
Project Handover · Commissioning and Handover
ChecklistACT-165
Integrated Systems Testing (IST) — Inspection Checklist
Integrated Systems Testing (IST) · Commissioning and Handover
Inspection and Test PlanACT-165
Integrated Systems Testing (IST) — Inspection and Test Plan
Integrated Systems Testing (IST) · Commissioning and Handover
Risk AssessmentACT-165
Integrated Systems Testing (IST) — Risk Assessment
Integrated Systems Testing (IST) · Commissioning and Handover
ChecklistACT-166
Snagging and De-snagging — Inspection Checklist
Snagging and De-snagging · Commissioning and Handover
Inspection and Test PlanACT-166
Snagging and De-snagging — Inspection and Test Plan
Snagging and De-snagging · Commissioning and Handover
Risk AssessmentACT-166
Snagging and De-snagging — Risk Assessment
Snagging and De-snagging · Commissioning and Handover
ChecklistACT-167
Final Cleaning — Inspection Checklist
Final Cleaning · Commissioning and Handover
Inspection and Test PlanACT-167
Final Cleaning — Inspection and Test Plan
Final Cleaning · Commissioning and Handover
Risk AssessmentACT-167
Final Cleaning — Risk Assessment
Final Cleaning · Commissioning and Handover
ChecklistACT-168
As-Built Drawings Preparation — Inspection Checklist
As-Built Drawings Preparation · Commissioning and Handover