ACT-168 / CLOSEOUT / R00
As-Built Drawing Verification Sheet
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Drawing and evidence
- Drawing number / revision / discipline / area and coordinated model or survey reference: ____________________
- Check installed routes, service invert levels, isolators, concealed interfaces and access points against survey and marked-up construction records.
- Document deviations and verify underlying change approvals; record outstanding clashes and unresolved departures.
Release
- Redline evidence / survey evidence / accepted submission reference: ____________________
- Prepared / checked / submitted / accepted by and dates: ____________________