As-Built Drawing Verification Sheet

As-Built Drawings PreparationCommissioning and Handover

ACT-168 / CLOSEOUT / R00

As-Built Drawing Verification Sheet

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Drawing and evidence

  • Drawing number / revision / discipline / area and coordinated model or survey reference: ____________________
  • Check installed routes, service invert levels, isolators, concealed interfaces and access points against survey and marked-up construction records.
  • Document deviations and verify underlying change approvals; record outstanding clashes and unresolved departures.

Release

  • Redline evidence / survey evidence / accepted submission reference: ____________________
  • Prepared / checked / submitted / accepted by and dates: ____________________