As-Built Drawings Preparation — Inspection and Test Plan

As-Built Drawings PreparationCommissioning and Handover

ACT-168 / ITP / R00

As-Built Drawings Preparation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Capture installed work before covering—————
Reconcile changes—————
Review coordinated revised drawings—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: construction redlines, survey data and latest issues

Inspection sequence

  • Capture installed work before covering
  • Reconcile changes
  • Review coordinated revised drawings

Inspection controls

  • Drawing ID, offsets, approvals and accepted revision
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.