As-Built Drawings Preparation — Risk Assessment

As-Built Drawings PreparationCommissioning and Handover

ACT-168 / RA / R00

As-Built Drawings Preparation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Capture installed work before covering—————
Reconcile changes—————
Review coordinated revised drawings—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: construction redlines, survey data and latest issues

Task risk review

  • Capture installed work before covering
  • Reconcile changes
  • Review coordinated revised drawings

Assessment prompts

  • Assess interfaces relevant to this location: Live systems, occupancy and simultaneous commissioning activities.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.