ACT-168 / CHK / R00
As-Built Drawings Preparation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Capture installed work before covering | — | — | — | — | — |
| Reconcile changes | — | — | — | — | — |
| Review coordinated revised drawings | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: construction redlines, survey data and latest issues
Inspection points
- Capture installed work before covering
- Reconcile changes
- Review coordinated revised drawings
Records and release
- Drawing ID, offsets, approvals and accepted revision
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________