ACT-167 / ITP / R00
Final Cleaning — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm finish-safe method | — | — | — | — | — |
| Clean by zone | — | — | — | — | — |
| Inspect before allowing access | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved cleaning agents, tools and protection
Inspection sequence
- Confirm finish-safe method
- Clean by zone
- Inspect before allowing access
Inspection controls
- Area release, residue, damage and disposal
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________