ACT-165 / CHK / R00
Integrated Systems Testing (IST) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Agree readiness and roles | — | — | — | — | — |
| Witness cross-system responses | — | — | — | — | — |
| Verify restoration | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: integrated test scripts, logs and instruments
Inspection points
- Agree readiness and roles
- Witness cross-system responses
- Verify restoration
Records and release
- Trigger and response timestamps, deviations and signed retests
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________