Integrated Systems Testing (IST) — Risk Assessment

Integrated Systems Testing (IST)Commissioning and Handover

ACT-165 / RA / R00

Integrated Systems Testing (IST) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Agree readiness and roles—————
Witness cross-system responses—————
Verify restoration—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: integrated test scripts, logs and instruments

Task risk review

  • Agree readiness and roles
  • Witness cross-system responses
  • Verify restoration

Assessment prompts

  • Assess interfaces relevant to this location: Live systems, occupancy and simultaneous commissioning activities.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________