ACT-165 / ITP / R00
Integrated Systems Testing (IST) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Agree readiness and roles | — | — | — | — | — |
| Witness cross-system responses | — | — | — | — | — |
| Verify restoration | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: integrated test scripts, logs and instruments
Inspection sequence
- Agree readiness and roles
- Witness cross-system responses
- Verify restoration
Inspection controls
- Trigger and response timestamps, deviations and signed retests
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________