ACT-166 / CHK / R00
Snagging and De-snagging — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Walk by zone | — | — | — | — | — |
| Classify and assign defects | — | — | — | — | — |
| Verify before closing each item | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: snag register, zone drawings and evidence capture
Inspection points
- Walk by zone
- Classify and assign defects
- Verify before closing each item
Records and release
- Issue IDs, owner, due date and before/after evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________