ACT-166 / ITP / R00
Snagging and De-snagging — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Walk by zone | — | — | — | — | — |
| Classify and assign defects | — | — | — | — | — |
| Verify before closing each item | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: snag register, zone drawings and evidence capture
Inspection sequence
- Walk by zone
- Classify and assign defects
- Verify before closing each item
Inspection controls
- Issue IDs, owner, due date and before/after evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________