ACT-062 / WIR / R00
Floor Tile Installation Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Inspection details
- Project: ____________________
- WIR reference / date: ____________________
- Location / level: ____________________
- Grid / room: ____________________
- Approved drawing and revision: ____________________
- Approved material submittal / approval reference: ____________________
- Tile batch / shade / calibre: ____________________
- Substrate release reference: ____________________
Installation checks
- Verify delivered tile matches approved sample, batch and shade. Record any mixed batches.
- Confirm screed or substrate release, curing and preparation before laying.
- Confirm setting-out, datum, pattern, cuts and thresholds against approved drawings.
- Check joint width, grout completeness and alignment through openings.
- Measure lippage at representative joints and record locations.
- Verify falls to drains where applicable and record measurement method.
- Check movement joints are carried through the finish and not bridged by adhesive or grout.
- Check for damaged, hollow, stained or chipped finishes and record exceptions.
- Confirm protection is installed and adjacent finishes are undamaged.
Project-defined acceptance and sign-off
- Approved limits for joint width / alignment / lippage / falls / flatness: ____________________
- Measured values and locations: ____________________
- Evidence (photo, test or markup references): ____________________
- Remarks and corrective actions: ____________________
- Inspection result: ____________________
- Contractor QC name / signature / date: ____________________
- Consultant inspector name / signature / date: ____________________