ACT-062 / RA / R00
Floor Tiling Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Work area and controls
- Locate the cutting station clear of occupied routes. Use the approved dust control and PPE for the selected tile and cutting method.
- Separate wet work and trailing leads from public access; protect designated pedestrian escape paths.
- Plan handling for heavy or large format tiles, including team lifts or suitable assistance.
- Review adhesive and grout safety data, ventilation and skin protection before work.
Site-specific assessment
- Hazard / persons exposed / initial rating / controls / residual rating / owner: ____________________
- Approved risk matrix / permit if applicable / emergency arrangements / briefing attendance: ____________________
- Supervisor and HSE acceptance, with dates: ____________________