ACT-158 / WIR / R00
Interlock Paving Installation Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Pre-lay release
- Area / grid / approved drainage and paving layout and revision: ____________________
- Confirm substrate levels, completed compaction records, bedding release, edging and reference mock-up.
Final inspection
- Record pattern, edge restraints, joint fill, compaction, surface drainage, rocking or damaged units and interface levels.
- Approved criteria / measurements / evidence / inspection disposition / signatures: ____________________