Interlock Paving Installation Checklist

Interlock PavingInfrastructure

ACT-158 / WIR / R00

Interlock Paving Installation Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Pre-lay release

  • Area / grid / approved drainage and paving layout and revision: ____________________
  • Confirm substrate levels, completed compaction records, bedding release, edging and reference mock-up.

Final inspection

  • Record pattern, edge restraints, joint fill, compaction, surface drainage, rocking or damaged units and interface levels.
  • Approved criteria / measurements / evidence / inspection disposition / signatures: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.