Handover / CloseoutACT-067-CLOSEOUTR00Available

Ceiling Closure and Coordinated Trade Release

Gypsum Board / Mineral Fibre False CeilingArchitectural

ACT-067 / CLOSEOUT / R00

Ceiling Closure and Coordinated Trade Release

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Release boundary

  • Corridor / level / grid / closure zone / ceiling layout revision: ____________________
  • Confirm duct leakage, fire damper access, chilled-water pressure test and insulation inspection references: ____________________
  • Confirm electrical tray supports, sprinkler testing, detector positions and fire-stopping records: ____________________

Final walkdown

  • Verify access panels align with isolation valves, dampers and equipment service clearances.
  • Record photographs before concealment and mark final coordinated routes on the approved drawing.
  • Outstanding defects / release decision / each trade and consultant sign-off: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.