ACT-067 / CLOSEOUT / R00
Ceiling Closure and Coordinated Trade Release
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Release boundary
- Corridor / level / grid / closure zone / ceiling layout revision: ____________________
- Confirm duct leakage, fire damper access, chilled-water pressure test and insulation inspection references: ____________________
- Confirm electrical tray supports, sprinkler testing, detector positions and fire-stopping records: ____________________
Final walkdown
- Verify access panels align with isolation valves, dampers and equipment service clearances.
- Record photographs before concealment and mark final coordinated routes on the approved drawing.
- Outstanding defects / release decision / each trade and consultant sign-off: ____________________