ACT-067 / ITP / R00
Gypsum Board / Mineral Fibre False Ceiling — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm trades are released | — | — | — | — | — |
| Install approved suspension module | — | — | — | — | — |
| Coordinate access before closure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hangers, grids, panels and access hatches
Inspection sequence
- Confirm trades are released
- Install approved suspension module
- Coordinate access before closure
Inspection controls
- Plenum release, ceiling level, support spacing and access
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________