Scope and project location
- Activity: Gypsum Board / Mineral Fibre False Ceiling. Discipline: Masonry & Architectural Finishes.
- Applicable work limits / project / area / grid / exclusions: ____________________
Approved references and technical limits
- Drawing and revision / specification clause / approved ITP: ____________________
- Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
- Permits / isolations / specialist and authority releases as applicable: ____________________
Responsibilities and resources
- Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
- Materials and equipment: hangers, grids, panels and access hatches.
- Approved submittals / equipment IDs and calibration: ____________________
Prerequisites and work sequence
- Prior-work release / interfaces / access / pre-task briefing: ____________________
- 1. Confirm trades are released.
- 2. Install approved suspension module.
- 3. Coordinate access before closure.
Inspection stages and required records
- Checks and evidence: Plenum release, ceiling level, support spacing and access.
- Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
- Nonconformance / corrective action / retest reference: ____________________
Approval