ACT-067 / CHK / R00
Gypsum Board / Mineral Fibre False Ceiling — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm trades are released | — | — | — | — | — |
| Install approved suspension module | — | — | — | — | — |
| Coordinate access before closure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hangers, grids, panels and access hatches
Inspection points
- Confirm trades are released
- Install approved suspension module
- Coordinate access before closure
Records and release
- Plenum release, ceiling level, support spacing and access
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________