Work Inspection RequestACT-065-WIRR00Available

Washroom Waterproofing Inspection and Release

Wet Area WaterproofingArchitectural

ACT-065 / WIR / R00

Washroom Waterproofing Inspection and Release

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Assembly release

  • Washroom / room number / detail and revision / drain tag: ____________________
  • Check falls, dry and sound substrate, specified primer and sealed service penetrations before coating.
  • Inspect membrane continuity at wall upstands, internal corners, door threshold and drain collar.

Before tiling

  • Project-defined thickness or coverage / measured values and locations: ____________________
  • Approved water-test criteria / witness and results / evidence before covering: ____________________
  • Repairs / retest / QC and consultant sign-off: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.