ACT-065 / ITP / R00
Wet Area Waterproofing — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release falls | — | — | — | — | — |
| Reinforce corners and penetrations | — | — | — | — | — |
| Inspect cured system before covering | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: membrane, reinforcing tape and drain collars
Inspection sequence
- Release falls
- Reinforce corners and penetrations
- Inspect cured system before covering
Inspection controls
- Coverage, collar detail, upstands and water test
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________