ACT-065 / RA / R00
Wet Area Waterproofing — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release falls | — | — | — | — | — |
| Reinforce corners and penetrations | — | — | — | — | — |
| Inspect cured system before covering | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: membrane, reinforcing tape and drain collars
Task risk review
- Release falls
- Reinforce corners and penetrations
- Inspect cured system before covering
Assessment prompts
- Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________