ACT-110 / TEST / R00
Stormwater Outlet Flow Test Record
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Test setup
- Roof zone / outlet tag / downstream discharge point: ____________________
- Approved drawing revision / test procedure / required flow and duration: ____________________
- Confirm clean strainer, accessible discharge and safe containment before introducing test water.
Observations and release
- Record start/stop times, test volume or flow, free discharge, ponding and leakage at visible connections: ____________________
- Record outstanding defects, retest reference and evidence: ____________________
- Tester / witness / signatures and dates: ____________________