Skip to content

Inspection and Test PlanACT-110-ITPR00Available

Storm Water Drainage — Inspection and Test Plan

Storm Water DrainagePlumbing

ACT-110 / ITP / R00

Storm Water Drainage — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate membrane flange—————
Verify slope and discharge—————
Witness controlled flow—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: outlets, strainers, stormwater pipes and supports

Inspection sequence

  • Coordinate membrane flange
  • Verify slope and discharge
  • Witness controlled flow

Inspection controls

  • Outlet ID, endpoint, ponding and leakage
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

4