ACT-056 / WIR / R00
Roof Drain and Membrane Interface Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Before covering
- Roof zone / outlet tag / drawing and revision: ____________________
- Confirm outlet body is restrained, recessed to the drainage datum and compatible with the approved membrane system.
- Verify substrate dryness, flange preparation, primer and local reinforcement against approved details.
Interface and test release
- Inspect continuity around the flange, clamping ring or approved termination, lap positions and upstand transitions.
- Record approved lap, termination and flood-test criteria: ____________________
- Photograph interface before protection; record evidence and separate stormwater inspection reference: ____________________
- Result / remarks / contractor and consultant signatures: ____________________