ACT-056 / ITP / R00
Roof Waterproofing and Insulation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release falls | — | — | — | — | — |
| Install approved roof build-up | — | — | — | — | — |
| Check flange, upstands and penetrations before covering | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: primer, membrane, insulation and drain accessories
Inspection sequence
- Release falls
- Install approved roof build-up
- Check flange, upstands and penetrations before covering
Inspection controls
- Laps, thickness, flood-test evidence and concealed photographs
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________