ACT-134 / WIR / R00
Switchgear and Electrical Panel Inspection
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Pre-energization inspection
- Panel tag / room / approved single-line diagram and revision / submittal and installation inspection references: ____________________
- Verify enclosure condition, access clearances, fixing, identification, earthing provisions and approved interlocks against project records.
- Record torque logs and test certificate references; do not use this form as an authorization to energize.
Disposition
- Outstanding actions / release references / electrical supervisor, QC and witness signatures: ____________________