ACT-134 / ITP / R00
MV / LV Switchgear and Panels Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release room and routes | — | — | — | — | — |
| Align panels | — | — | — | — | — |
| Obtain authorised pre-energisation review | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: switchgear lineup, plinth and certified instruments
Inspection sequence
- Release room and routes
- Align panels
- Obtain authorised pre-energisation review
Inspection controls
- Tags, interlocks, torque, earthing and tests; not energisation authority
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________