ACT-134 / RA / R00
MV / LV Switchgear and Panels Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release room and routes | — | — | — | — | — |
| Align panels | — | — | — | — | — |
| Obtain authorised pre-energisation review | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: switchgear lineup, plinth and certified instruments
Task risk review
- Release room and routes
- Align panels
- Obtain authorised pre-energisation review
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________