ACT-035 / WIR / R00
Concrete Pre-Pour Release Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Release boundary
- Pour zone / grid and level / drawings and revisions / pour reference: ____________________
- Check referenced acceptance of formwork, reinforcement, cover blocks, couplers, joints, sleeves and embedded items.
- Confirm access, cleanliness, approved mix, test sampling arrangements and inspection release before placement.
Sign-off
- Project criteria / exceptions / delivery ticket record / release timestamp / QC and consultant signatures: ____________________