Inspection and Test PlanACT-035-ITPR00Available

Concrete Pouring (General) — Inspection and Test Plan

Concrete Pouring (General)Structural

ACT-035 / ITP / R00

Concrete Pouring (General) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm pre-pour release—————
Trace deliveries—————
Place, protect and cure in approved sequence—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved concrete, placing tools and sample moulds

Inspection sequence

  • Confirm pre-pour release
  • Trace deliveries
  • Place, protect and cure in approved sequence

Inspection controls

  • Tickets, consistency, temperature, sample IDs and pour card
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________