ACT-035 / ITP / R00
Concrete Pouring (General) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm pre-pour release | — | — | — | — | — |
| Trace deliveries | — | — | — | — | — |
| Place, protect and cure in approved sequence | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved concrete, placing tools and sample moulds
Inspection sequence
- Confirm pre-pour release
- Trace deliveries
- Place, protect and cure in approved sequence
Inspection controls
- Tickets, consistency, temperature, sample IDs and pour card
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________