ACT-090 / TEST / R00
Façade Sealant and Water Test Witness Record
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Test bay
- Bay / orientation / drawing revision / approved test procedure and acceptance criteria: ____________________
- Confirm approved sealant, backing, preparation and documented cure; identify drainage paths, joints and tested interface extents.
Test observations
- Equipment and calibration / test conditions / observation side / leakage location and time / evidence: ____________________
- Rectification and retest references / installer, specialist and witness signatures: ____________________