ACT-090 / ITP / R00
Façade Sealants and Water Testing — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release joint surfaces | — | — | — | — | — |
| Install and document cure | — | — | — | — | — |
| Witness the approved bay test | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sealant, backer, primer and water-test equipment
Inspection sequence
- Release joint surfaces
- Install and document cure
- Witness the approved bay test
Inspection controls
- Joint geometry, compatibility, leakage and retest
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________