ACT-090 / RA / R00
Façade Sealants and Water Testing — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release joint surfaces | — | — | — | — | — |
| Install and document cure | — | — | — | — | — |
| Witness the approved bay test | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sealant, backer, primer and water-test equipment
Task risk review
- Release joint surfaces
- Install and document cure
- Witness the approved bay test
Assessment prompts
- Assess interfaces relevant to this location: Falling objects, lifting and access at height.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________