Façade Sealants and Water Testing — Inspection Checklist

Façade Sealants and Water TestingArchitectural

ACT-090 / CHK / R00

Façade Sealants and Water Testing — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release joint surfaces—————
Install and document cure—————
Witness the approved bay test—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: sealant, backer, primer and water-test equipment

Inspection points

  • Release joint surfaces
  • Install and document cure
  • Witness the approved bay test

Records and release

  • Joint geometry, compatibility, leakage and retest
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.