ACT-074 / WIR / R00
Fire-Rated Door Assembly Inspection
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Assembly identification
- Door number / handing / rated wall detail / certified door-set reference: ____________________
- Check that leaf, frame, anchors, perimeter treatment, seals and hardware are part of the approved configuration.
Fit and functional inspection
- Record project-approved gaps and measured values at head, jambs and sill: ____________________
- Confirm self-closing, positive latching and egress operation as specified. Record damage, alterations or missing certification.
- Installer / QC / consultant disposition and signatures: ____________________