ACT-074 / ITP / R00
Steel / Fire-Rated Doors Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify rated assembly and wall | — | — | — | — | — |
| Install approved fixings | — | — | — | — | — |
| Inspect latching and closing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: listed door leaf, frame, seals and hardware
Inspection sequence
- Verify rated assembly and wall
- Install approved fixings
- Inspect latching and closing
Inspection controls
- Label, gaps, closer, seal continuity and frame perimeter
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________