Steel / Fire-Rated Doors Installation — Inspection and Test Plan

Steel / Fire-Rated Doors InstallationArchitectural

ACT-074 / ITP / R00

Steel / Fire-Rated Doors Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify rated assembly and wall—————
Install approved fixings—————
Inspect latching and closing—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: listed door leaf, frame, seals and hardware

Inspection sequence

  • Verify rated assembly and wall
  • Install approved fixings
  • Inspect latching and closing

Inspection controls

  • Label, gaps, closer, seal continuity and frame perimeter
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.