ACT-074 / RA / R00
Steel / Fire-Rated Doors Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify rated assembly and wall | — | — | — | — | — |
| Install approved fixings | — | — | — | — | — |
| Inspect latching and closing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: listed door leaf, frame, seals and hardware
Task risk review
- Verify rated assembly and wall
- Install approved fixings
- Inspect latching and closing
Assessment prompts
- Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________