Inspection and Test PlanACT-025-ITPR00Available

Raft Foundation Construction — Inspection and Test Plan

Raft Foundation ConstructionCivil

ACT-025 / ITP / R00

Raft Foundation Construction — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release substrate and membrane—————
Coordinate raft rebar and embeds—————
Secure pre-pour release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: rebar, spacers, sleeves, waterstops and concrete

Inspection sequence

  • Release substrate and membrane
  • Coordinate raft rebar and embeds
  • Secure pre-pour release

Inspection controls

  • Cover, embed locations, concrete tests and raft survey
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________