Skip to content

ChecklistACT-020-CHKR00Available

Pile Integrity Testing — Inspection Checklist

Pile Integrity TestingCivil

ACT-020 / CHK / R00

Pile Integrity Testing — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Identify pile—————
Release prepared head—————
Witness repeat traces and submit for specialist interpretation—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: impact tool, sensor and acquisition equipment

Inspection points

  • Identify pile
  • Release prepared head
  • Witness repeat traces and submit for specialist interpretation

Records and release

  • Pile ID, trace repeatability and report; no capacity inference
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

4