ACT-020 / ITP / R00
Pile Integrity Testing — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Identify pile | — | — | — | — | — |
| Release prepared head | — | — | — | — | — |
| Witness repeat traces and submit for specialist interpretation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: impact tool, sensor and acquisition equipment
Inspection sequence
- Identify pile
- Release prepared head
- Witness repeat traces and submit for specialist interpretation
Inspection controls
- Pile ID, trace repeatability and report; no capacity inference
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________