ACT-015 / CHK / R00
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm approved shoring type | — | — | — | — | — |
| Release guides | — | — | — | — | — |
| Verify support before excavation advances | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sheet or pile system, guide frame and monitoring instruments
Inspection points
- Confirm approved shoring type
- Release guides
- Verify support before excavation advances
Records and release
- Toe levels, alignment and trigger/action monitoring
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________