Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Inspection and Test Plan

Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles)Civil

ACT-015 / ITP / R00

Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm approved shoring type—————
Release guides—————
Verify support before excavation advances—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: sheet or pile system, guide frame and monitoring instruments

Inspection sequence

  • Confirm approved shoring type
  • Release guides
  • Verify support before excavation advances

Inspection controls

  • Toe levels, alignment and trigger/action monitoring
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.