ACT-015 / RA / R00
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm approved shoring type | — | — | — | — | — |
| Release guides | — | — | — | — | — |
| Verify support before excavation advances | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sheet or pile system, guide frame and monitoring instruments
Task risk review
- Confirm approved shoring type
- Release guides
- Verify support before excavation advances
Assessment prompts
- Assess interfaces relevant to this location: Excavation edges, underground services and mobile plant.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________