ACT-019 / ITP / R00
Pile Load Testing (Static / Dynamic) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Identify test pile | — | — | — | — | — |
| Obtain specialist setup release | — | — | — | — | — |
| Witness approved load programme | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved reaction or dynamic test equipment
Inspection sequence
- Identify test pile
- Obtain specialist setup release
- Witness approved load programme
Inspection controls
- Load/displacement or dynamic trace, timestamps and engineer disposition
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________