Skip to content

Method StatementACT-019-MSR00Available

Pile Load Testing (Static / Dynamic) Method Statement

Pile Load Testing (Static / Dynamic)Civil

ACT-019 / MS / R00

Pile Load Testing (Static / Dynamic) Method Statement

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Scope and project location

  • Activity: Pile Load Testing (Static / Dynamic). Discipline: Earthworks & Foundations.
  • Applicable work limits / project / area / grid / exclusions: ____________________

Approved references and technical limits

  • Drawing and revision / specification clause / approved ITP: ____________________
  • Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
  • Permits / isolations / specialist and authority releases as applicable: ____________________

Responsibilities and resources

  • Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
  • Materials and equipment: approved reaction or dynamic test equipment.
  • Approved submittals / equipment IDs and calibration: ____________________

Prerequisites and work sequence

  • Prior-work release / interfaces / access / pre-task briefing: ____________________
  • 1. Identify test pile.
  • 2. Obtain specialist setup release.
  • 3. Witness approved load programme.

Inspection stages and required records

  • Checks and evidence: Load/displacement or dynamic trace, timestamps and engineer disposition.
  • Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
  • Nonconformance / corrective action / retest reference: ____________________

Approval

  • Prepared by / reviewed by / approved by / signatures and dates: ____________________